Project Overview
Sedenak Tech Park in Kulai is the largest data centre cluster in Southeast Asia, with new plots breaking ground continuously. Green City Machinery supplies operated plant on data centre works inside the park, including a scope for Huashi (Malaysia) Sdn Bhd on Project Falcon, a hyperscale data centre development within the park.
For that scope we supplied four operated units: two backhoe loaders and two excavators, working on site preparation, earthwork and general construction support alongside the main contractor’s programme.
The photographs on this page show how a tech park deployment actually runs. A machine mobilises, works its part of the programme, and comes off site when that part is finished. In July our client asked for a second backhoe loader to speed the job up, and it was working the same week. A few days later a short tail excavator demobilised because its part was complete. Machines have kept coming and going from the park since.
Project Snapshot
Location
Sedenak Tech Park, Kulai, Johor
Our Client
Huashi (Malaysia) Sdn Bhd
Sector
Hyperscale Data Centre Development
Our Scope
4 operated units: 2 backhoe loaders, 2 excavators
Work
Site preparation, earthwork, general construction support
Status
Ongoing works within the park
The Units We Supplied
Four operated units for Huashi on Project Falcon, with our own operators.
2 × Backhoe Loader
Service trenches, confined areas, backfilling and the finishing work around structures. A second unit was added mid-programme at the client’s request.
2 × Excavator
General earthwork, cut-and-fill, trenching and site preparation across the plot, working to the main contractor’s daily sequence.
On Site at Sedenak Tech Park
Photographs taken on data centre works inside Sedenak Tech Park, Kulai.
How We Work Inside a Tech Park
Mobilised Fast
Demobbed When Done
Operated Units
Coordinated With Other Trades
The Same Team Comes Back
The Challenge
Sedenak Tech Park has several data centre plots under construction at the same time, each with its own programme and access control. A machine has to arrive when a package is ready for it, work to that package’s sequence, and clear the site when it is finished, without holding anyone else up.
The Result
Machines mobilised and demobilised on the client’s programme, with a second backhoe added on request inside the same week.